Many homes in Bloomfield, Montclair, Kearny, and Jersey City were built between the 1900s and the 1960s. They have character, and they also have plaster walls, older wiring, and floors that have settled over the decades. A kitchen remodel opens all of that up, so the best plans account for it from the start.
Set aside a contingency of ten to fifteen percent of the budget for what is behind the walls. Most of the time it goes to electrical updates, since modern kitchens need dedicated circuits for appliances that older panels were never designed to carry.
Expect some floor leveling. Cabinets and stone countertops need a flat, level base, and older floors rarely are. Leveling the subfloor before cabinets go in costs far less than fighting gaps and uneven counters afterward.
Finally, finish your choices before demolition day. Cabinets, counters, tile, and fixtures should be selected and ordered before the old kitchen comes out. That single decision is what keeps a kitchen remodel measured in weeks instead of months.